Process Control ACE-ZNS20-C · Peak temperature
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Process Control

Every release of a grade against the customer specification and against Sun Ace's own action limits, the moment QC closes the batch.

Newest release

B26-0380 ACE-ZNS 20 C · zinc stearate, wood coating grade · 2,927 kg made 24 Jul 2026 Pass

Closed by Karen Doust at 10:38am · 10 days ago · WO-2026-0380

1,200 kg still on the rack, 1,727 kg already gone .

Releases plotted

11

09 Aug 2025 to 24 Jul 2026

Peak temperature · published grade

Inside spec, outside our limits

0

Every release sat inside the action limits

Nothing to check

Outside the customer spec

0

No release broke the specification

Clean

The line

No comparison

Only 1 release in the last week of production

Widen the window

Every measure on the release

Pick one to open it below. Bands as drawn on the big chart.

ACE-ZNS 20 C · zinc stearate, wood coating grade · Peak temperature

Customer specification 128.0 to 142.0°C from the QP-STEARATE plan. Action limits 130.8 to 139.2, the middle 60% of the customer window, measured out from target.

Inside the action limits Inside the customer spec, outside our limits Outside the customer spec
Reading
125 130 135 140 145 Peak temperature (°C) Customer spec 142.0 Action limit 139.2 Target 135.0 Action limit 130.8 Customer spec 128.0 B25-0723 · 135.3°C B25-0719 · 136.8°C B25-0795 · 133.9°C B25-0809 · 133.0°C B26-0073 · 133.5°C B26-0182 · 133.9°C B26-0201 · 134.7°C B26-0253 · 133.1°C B26-0297 · 135.4°C B26-0368 · 136.2°C B26-0380 · 135.2°C Aug 25 Sep 25 Oct 25 Jan 26 Mar 26 Apr 26 May 26 Jun 26 Jul 26 Releases in the order they were made, oldest at the left 6 between 132.5 and 135.0°C 5 between 135.0 and 137.5°C 0 2 4 6 Releases per 2.5°C band

11 releases of ACE-ZNS20-C · 0 inside the customer specification but outside the action limits · 0 outside the specification · widest reading 136.8°C, narrowest 133.0°C.

Worth a look

Releases outside the action limits, newest first, with what is still on the rack.

Every release of ACE-ZNS20-C sat inside the action limits on Peak temperature.

Is the line getting skinnier

How much of the customer window the releases occupy, measured back from the last run on 24 Jul 2026.

Window Releases Lowest Highest Window used
Last week of production 1 135.2 135.2 Too few
Last month 2 135.2 136.2 Too few
Last two months 3 135.2 136.2
7%

Too few releases in the last week of production to read against the two-month baseline.

The readings

The charts above as numbers, newest first. ◆ past our action limits, ■ outside the customer specification.

Download CSV
Batch Made Yield
%
Peak temperature
°C
Metal content
%
Moisture
%
Bulk density
g/L
Sieve residue 75 µm
%
Melting point
°C
Free fatty acid
%
Verdict
B26-0380 24 Jul 2026 99.20 135.2 6.87 0.37 318 0.11 154.1 0.67 Pass
B26-0368 01 Jul 2026 99.04 136.2 6.87 0.57 301 0.06 155.0 0.57 Pass
B26-0297 21 Jun 2026 99.70 135.4 6.91 0.77 304 0.04 153.5 0.31 Pass
B26-0253 20 May 2026 99.14 133.1 6.76 0.74 323 0.14 154.7 0.37 Pass
B26-0201 06 Apr 2026 99.77 ◆ 134.7 6.70 0.62 323 0.07 152.2 0.48 Pass
B26-0182 01 Mar 2026 99.11 133.9 6.85 0.63 337 0.14 153.5 0.43 Pass
B26-0073 21 Jan 2026 99.58 133.5 6.93 0.67 309 0.04 158.1 0.53 Pass
B25-0809 08 Oct 2025 99.04 133.0 6.89 0.63 315 0.09 153.3 0.57 Pass
B25-0795 24 Sep 2025 99.72 133.9 6.92 0.74 332 0.16 157.9 0.42 Pass
B25-0719 20 Aug 2025 99.63 136.8 6.82 0.53 329 0.12 154.5 0.40 Pass
B25-0723 09 Aug 2025 99.58 135.3 6.68 0.75 327 0.11 152.3 0.60 Pass