SUNACE
Work in Process $55,505 in 1320
July 2026 close · posted live Mon 3 Aug 2026

Finance

Work in Process

What sits in 1320, job by job, and what has to happen before each one clears.

In 1320 now

$55,505

4 jobs open

Still being made

$55,059

2 jobs, charge not yet receipted

Held at the gate

$351

1 off the machine, awaiting release

Cannot close until quality release

Production variance

$238,282

565 jobs closed

Cost more than standard

How a job clears

1 · Issue

Dr 1320 Work in Process
Cr 1310 Raw Materials
Cr 5200 / 5300 recoveries

Materials at weighted average, labour at the work centre rate, overhead on the labour.

2 · Receipt

Dr 1330 Finished Goods
Cr 1320 Work in Process

At standard cost, not at actual. Whatever is left in 1320 is the difference.

3 · Gate

No posting

Quality release the batch or it goes no further. The goods exist and the money stays in 1320.

4 · Closure

Dr 5400 Production Variance
Cr 1320 Work in Process

Or the other way round when it cost less. 1320 goes to nil for that job.

Open jobs

4 with a balance in 1320
Works order Stage Charged Made Receipted at standard Variance In 1320 Waiting on
WO-2026-0450
SAK-CZC60 · SAK-CZC 60 · Ca/Zn one pack, 70°C cable insulation
Issued $29,287
$29,287 mat · $0 conv
— — — $29,287 Still on the machine
WO-2026-0449
ACE-CAS10 · ACE-CAS 10 · calcium stearate, PVC grade
Issued $25,772
$21,876 mat · $3,896 conv
— — — $25,772 Still on the machine
WO-2026-0448
SAK-CZP30 · SAK-CZP 30 · Ca/Zn one pack, pressure pipe
Held at the gate $60,887
$50,544 mat · $10,343 conv
11,940 kg
99.5% of plan
$60,536
$5.07/kg
+$351 $351 Quality release
Materials or hours away from the standard the formulation is written to
WO-2026-0447
SAK-CZB65 · SAK-CZB 65 · Ca/Zn one pack, bottle closure, low taint
Rejected $9,242
$7,256 mat · $1,986 conv
1,980 kg
99.0% of plan
$9,148
$4.62/kg
+$95 $95 Rejected at the gate, not for finished goods
Materials or hours away from the standard the formulation is written to
1320 Work in Process control account $55,505 Computed from the jobs, not stored beside them

Production variance posted at closure

$238,282 against standard · $0 under
Works order Grade Charged Standard Variance Why
WO-2025-0907
Tui Faletau · 14 Dec 2025
INT-CAST70 $40,769 $39,233 +$1,537 Yield 96.2% against a 97.2% standard, so fewer kilograms carried the same charge
WO-2025-0923
Malcolm Rees · 17 Dec 2025
INT-CAST70 $40,769 $39,236 +$1,533 Yield 96.2% against a 97.2% standard, so fewer kilograms carried the same charge
WO-2026-0257
Tui Faletau · 19 May 2026
INT-CAST70 $40,769 $39,239 +$1,530 Yield 96.2% against a 97.2% standard, so fewer kilograms carried the same charge
WO-2025-0762
Tui Faletau · 07 Sep 2025
INT-CAST70 $40,769 $39,246 +$1,523 Yield 96.2% against a 97.2% standard, so fewer kilograms carried the same charge
WO-2025-0909
Sione Naufahu · 07 Dec 2025
INT-CAST70 $40,769 $39,246 +$1,523 Yield 96.2% against a 97.2% standard, so fewer kilograms carried the same charge
WO-2026-0209
Sione Naufahu · 13 Apr 2026
INT-CAST70 $40,769 $39,253 +$1,516 Yield 96.2% against a 97.2% standard, so fewer kilograms carried the same charge
WO-2025-0839
Malcolm Rees · 09 Oct 2025
INT-CAST70 $40,769 $39,321 +$1,448 Yield 96.4% against a 97.2% standard, so fewer kilograms carried the same charge
WO-2026-0086
Tui Faletau · 18 Jan 2026
INT-CAST70 $40,769 $39,369 +$1,401 Yield 96.5% against a 97.2% standard, so fewer kilograms carried the same charge