Process Control SAK-CZM18 · Yield
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Process Control

Every release of a grade against the customer specification and against Sun Ace's own action limits, the moment QC closes the batch.

Newest release

B26-0296 SAK-CZM 18 · Ca/Zn one pack, medical film · 1,481 kg made 26 Jun 2026 Pass

Closed by Vinh Le at 10:53am · 38 days ago · WO-2026-0296

101 kg still on the rack, 1,380 kg already gone to Australian Vinyls Corporation Pty Ltd.

Releases plotted

24

01 Aug 2025 to 26 Jun 2026

Yield · published grade

Inside spec, outside our limits

2

Most recent B26-0137 on 01 Feb 2026

Sellable, worth a look before it goes

Outside the customer spec

0

No release broke the specification

Clean

The line

No comparison

Only 1 release in the last week of production

Widen the window

Every measure on the release

Pick one to open it below. Bands as drawn on the big chart.

SAK-CZM 18 · Ca/Zn one pack, medical film · Yield

Customer specification 97.50 to 100.00% from the QP-PHARMA plan. Action limits 98.26 to 99.76, the middle 60% of the customer window, measured out from target.

Inside the action limits Inside the customer spec, outside our limits Outside the customer spec
Reading

24 releases of SAK-CZM18 · 2 inside the customer specification but outside the action limits · 0 outside the specification · widest reading 99.79%, narrowest 99.02%.

Worth a look

Releases outside the action limits, newest first, with what is still on the rack.

Batch Yield State Stock
B26-0137
01 Feb 2026
99.77 %
Sellable, past our limit
0.01% past it · 62% of the way to the customer limit
569 kg on hand
553 kg gone to Australian Vinyls Corporation Pty Ltd
B25-0916
14 Dec 2025
99.79 %
Sellable, past our limit
0.03% past it · 65% of the way to the customer limit
657 kg on hand
593 kg gone to Welvic Australia Pty Ltd

Is the line getting skinnier

How much of the customer window the releases occupy, measured back from the last run on 26 Jun 2026.

Window Releases Lowest Highest Window used
Last week of production 1 99.04 99.04 Too few
Last month 2 99.04 99.61 Too few
Last two months 2 99.04 99.61 Too few

Too few releases in the last week of production to read against the two-month baseline.

The readings

The charts above as numbers, newest first. ◆ past our action limits, ■ outside the customer specification.

Download CSV
Batch Made Yield
%
Assay
%
Heavy metals
ppm
Moisture
%
Metal content
%
Sieve residue 75 µm
%
Verdict
B26-0296 26 Jun 2026 99.04 99.23 2.4 0.79 6.78 0.11 Pass
B26-0323 05 Jun 2026 99.61 99.84 3.1 0.51 6.95 0.14 Pass
B26-0224 05 Apr 2026 99.63 99.32 1.0 0.61 6.85 0.11 Pass
B26-0195 08 Mar 2026 99.71 99.66 3.6 0.70 6.82 0.11 Pass
B26-0153 04 Mar 2026 99.13 99.64 2.7 0.36 6.89 0.14 Pass
B26-0128 09 Feb 2026 99.02 99.99 2.2 0.51 6.95 0.17 Pass
B26-0137 01 Feb 2026 99.77 ◆ 99.78 1.4 0.68 6.69 0.04 Pass
B26-0108 25 Jan 2026 99.67 99.13 1.5 0.44 6.88 0.18 Pass
B26-0097 21 Jan 2026 99.73 100.12 2.8 0.49 6.77 0.15 Pass
B26-0096 19 Jan 2026 99.03 101.99 ■ 1.6 0.68 6.81 0.17 Fail
B26-0070 18 Jan 2026 99.66 99.29 0.9 0.70 6.84 0.17 Pass
B26-0103 15 Jan 2026 99.06 99.52 0.6 0.48 6.79 0.05 Pass
B26-0071 15 Jan 2026 99.19 99.78 2.1 0.69 6.95 0.16 Pass
B26-0076 11 Jan 2026 99.73 99.57 3.1 0.36 6.64 0.12 Pass
B25-0918 15 Dec 2025 99.40 99.96 1.4 0.70 6.67 0.06 Pass
B25-0916 14 Dec 2025 99.79 ◆ 99.73 3.4 0.58 6.96 0.13 Pass
B25-0862 10 Nov 2025 99.63 99.94 1.5 0.42 6.89 0.06 Pass
B25-0808 12 Oct 2025 99.46 100.06 2.7 0.47 6.63 0.17 Pass
B25-0827 06 Oct 2025 99.16 99.99 1.4 0.60 6.80 0.14 Pass
B25-0830 03 Oct 2025 99.59 99.40 3.4 0.39 6.99 0.16 Pass
B25-0760 08 Sep 2025 99.08 99.72 2.5 0.67 6.70 0.12 Pass
B25-0777 06 Sep 2025 99.44 99.42 2.8 0.55 6.74 0.18 Pass
B25-0728 20 Aug 2025 99.05 99.12 3.2 0.58 6.80 0.17 Pass
B25-0737 01 Aug 2025 99.51 99.52 0.8 0.80 6.86 0.16 Pass