Quality Trends Melting point · 23 releases
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Quality Trends

Every release in the order it was made, against its specification limits.

Releases plotted

23

ACE-CAS 20 · calcium stearate, polyolefin acid scavenger

Average melting point

155.1°C

Specification 145.0 to 165.0°C · target 155.0°C

+0.1 against target

Outside specification

0

Every release inside its limits

Clean run

Process capability, Cpk

2.31

Comfortably inside the limits

σ 1.4°C

Melting point by batch, in the order it was made

Red bands are the specification limits, the dashed line is target.

Inside spec Near a limit Out of spec
142.6 148.8 155.0 161.2 167.4 Upper 165.0°C Lower 145.0°C Target 155.0°C B25-0749 · ACE-CAS20 · 21 Aug 2025 · 155.4°C B25-0796 · ACE-CAS20 · 10 Sep 2025 · 157.1°C · +1.7 on the job before B25-0779 · ACE-CAS20 · 23 Sep 2025 · 155.8°C · -1.3 on the job before B25-0815 · ACE-CAS20 · 25 Oct 2025 · 155.3°C · -0.5 on the job before B25-0868 · ACE-CAS20 · 18 Nov 2025 · 155.0°C · -0.3 on the job before B25-0885 · ACE-CAS20 · 20 Nov 2025 · 153.5°C · -1.5 on the job before B25-0896 · ACE-CAS20 · 03 Dec 2025 · 157.5°C · +4.0 on the job before B25-0911 · ACE-CAS20 · 09 Dec 2025 · 155.8°C · -1.7 on the job before B25-0904 · ACE-CAS20 · 12 Dec 2025 · 152.3°C · -3.5 on the job before B25-0912 · ACE-CAS20 · 13 Dec 2025 · 152.9°C · +0.6 on the job before B25-0925 · ACE-CAS20 · 18 Dec 2025 · 156.1°C · +3.2 on the job before B25-0928 · ACE-CAS20 · 24 Dec 2025 · 155.5°C · -0.6 on the job before B26-0123 · ACE-CAS20 · 03 Feb 2026 · 153.2°C · -2.3 on the job before B26-0125 · ACE-CAS20 · 03 Feb 2026 · 154.6°C · +1.4 on the job before B26-0164 · ACE-CAS20 · 21 Mar 2026 · 152.7°C · -1.9 on the job before B26-0158 · ACE-CAS20 · 25 Mar 2026 · 154.3°C · +1.6 on the job before B26-0246 · ACE-CAS20 · 11 Apr 2026 · 154.2°C · -0.1 on the job before B26-0265 · ACE-CAS20 · 04 May 2026 · 155.5°C · +1.3 on the job before B26-0293 · ACE-CAS20 · 26 May 2026 · 156.0°C · +0.5 on the job before B26-0339 · ACE-CAS20 · 08 Jun 2026 · 155.8°C · -0.2 on the job before B26-0326 · ACE-CAS20 · 14 Jun 2026 · 156.7°C · +0.9 on the job before B26-0382 · ACE-CAS20 · 17 Jul 2026 · 156.1°C · -0.6 on the job before B26-0386 · ACE-CAS20 · 19 Jul 2026 · 156.3°C · +0.2 on the job before Aug 2025 Sep 2025 Oct 2025 Nov 2025 Dec 2025 Feb 2026 Mar 2026 Apr 2026 May 2026 Jun 2026 Jul 2026

Nothing outside the limits

Every melting point release in this run sat inside its specification.

The biggest movement in the run

The largest change from one job to the next.

B25-0885
20 Nov 2025 · RX-03, Malcolm Rees
ACE-CAS20 · 7,796 kg
153.5°C
B25-0896
03 Dec 2025 · RX-03, Sione Naufahu
ACE-CAS20 · 7,790 kg
157.5°C
+4.0 on the job before
B25-0911
09 Dec 2025 · RX-03, Sione Naufahu
ACE-CAS20 · 7,865 kg
155.8°C
WO-2025-0896 ran on RX-03 under Sione Naufahu.