SUNACE
SUNACE
Quality Trends Torque, peak · 22 releases
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Quality Trends

Every release in the order it was made, against its specification limits.

Releases plotted

22

SAK-BZL 40 · liquid Ba/Zn, low phenol, flexible

Average torque, peak

42.0Nm

Specification 40.7 to 43.3Nm · target 42.0Nm

+0.0 against target

Outside specification

0

Every release inside its limits

Clean run

Process capability, Cpk

1.61

Comfortably inside the limits

σ 0.3Nm

Torque, peak by batch, in the order it was made

Red bands are the specification limits, the dashed line is target.

Inside spec Near a limit Out of spec
40.4 41.2 42.0 42.8 43.6 Upper 43.3Nm Lower 40.7Nm Target 42.0Nm B25-0755 · SAK-BZL40 · 04 Sep 2025 · 41.9Nm B25-0781 · SAK-BZL40 · 18 Sep 2025 · 42.1Nm · +0.2 on the job before B25-0838 · SAK-BZL40 · 14 Oct 2025 · 42.4Nm · +0.3 on the job before B25-0834 · SAK-BZL40 · 24 Oct 2025 · 42.1Nm · -0.3 on the job before B25-0877 · SAK-BZL40 · 04 Nov 2025 · 42.3Nm · +0.2 on the job before B25-0850 · SAK-BZL40 · 10 Nov 2025 · 42.2Nm · -0.1 on the job before B25-0853 · SAK-BZL40 · 24 Nov 2025 · 41.7Nm · -0.5 on the job before B25-0942 · SAK-BZL40 · 26 Dec 2025 · 42.2Nm · +0.5 on the job before B26-0093 · SAK-BZL40 · 10 Jan 2026 · 42.3Nm · +0.1 on the job before B26-0101 · SAK-BZL40 · 13 Jan 2026 · 42.0Nm · -0.3 on the job before B26-0075 · SAK-BZL40 · 20 Jan 2026 · 41.7Nm · -0.3 on the job before B26-0083 · SAK-BZL40 · 21 Jan 2026 · 41.8Nm · +0.1 on the job before B26-0077 · SAK-BZL40 · 24 Jan 2026 · 42.1Nm · +0.3 on the job before B26-0140 · SAK-BZL40 · 13 Feb 2026 · 41.6Nm · -0.5 on the job before B26-0230 · SAK-BZL40 · 01 Apr 2026 · 41.8Nm · +0.2 on the job before B26-0243 · SAK-BZL40 · 22 Apr 2026 · 42.4Nm · +0.6 on the job before B26-0222 · SAK-BZL40 · 25 Apr 2026 · 41.9Nm · -0.5 on the job before B26-0255 · SAK-BZL40 · 19 May 2026 · 41.6Nm · -0.3 on the job before B26-0267 · SAK-BZL40 · 19 May 2026 · 42.0Nm · +0.4 on the job before B26-0270 · SAK-BZL40 · 19 May 2026 · 42.4Nm · +0.4 on the job before B26-0312 · SAK-BZL40 · 09 Jun 2026 · 42.1Nm · -0.3 on the job before B26-0337 · SAK-BZL40 · 23 Jun 2026 · 42.3Nm · +0.2 on the job before Sep 2025 Oct 2025 Nov 2025 Dec 2025 Jan 2026 Feb 2026 Apr 2026 May 2026 Jun 2026

Nothing outside the limits

Every torque, peak release in this run sat inside its specification.

The biggest movement in the run

The largest change from one job to the next.

B26-0230
01 Apr 2026 · RX-02, Tui Faletau
SAK-BZL40 · 3,959 kg
41.8Nm
B26-0243
22 Apr 2026 · RX-02, Malcolm Rees
SAK-BZL40 · 3,987 kg
42.4Nm
+0.6 on the job before
B26-0222
25 Apr 2026 · RX-02, Tui Faletau
SAK-BZL40 · 3,981 kg
41.9Nm
WO-2026-0243 ran on RX-02 under Malcolm Rees.