Quality Trends Fusion time · 1 releases
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Quality Trends

Every release in the order it was made, against its specification limits.

Releases plotted

1

SAK-CZB 65 · Ca/Zn one pack, bottle closure, low taint

Average fusion time

57.4s

Specification 52.4 to 55.6s · target 54.0s

+3.4 against target

Outside specification

1

Listed underneath with the job behind each one

100.0% of releases

Process capability, Cpk

0.00

Spread is wide against the limits

σ 0.0s

Fusion time by batch, in the order it was made

Red bands are the specification limits, the dashed line is target.

Inside spec Near a limit Out of spec
51.8 53.3 54.9 56.5 58.0 Upper 55.6s Lower 52.4s Target 54.0s B26-0441 · SAK-CZB65 · 30 Jul 2026 · 57.4s Jul 2026

Worth a look

Releases outside a limit or close to one, newest first.

Batch Made Fusion time On the job before Where
B26-0441
SAK-CZB65
30 Jul 2026 57.4s
Out of spec
— WO-2026-0447
BL-01 · Tui Faletau

The biggest movement in the run

The largest change from one job to the next.

Not enough releases in this run to compare one job to the next.