SUNACE
SUNACE
Quality Trends Fusion time · 18 releases
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Quality Trends

Every release in the order it was made, against its specification limits.

Releases plotted

18

SAK-CZC 70 · Ca/Zn one pack, 90°C cable insulation

Average fusion time

54.1s

Specification 52.4 to 55.6s · target 54.0s

+0.1 against target

Outside specification

0

Every release inside its limits

Clean run

Process capability, Cpk

1.85

Comfortably inside the limits

σ 0.3s

Fusion time by batch, in the order it was made

Red bands are the specification limits, the dashed line is target.

Inside spec Near a limit Out of spec

Nothing outside the limits

Every fusion time release in this run sat inside its specification.

The biggest movement in the run

The largest change from one job to the next.

B25-0744
02 Aug 2025 · BL-01, Tui Faletau
SAK-CZC70 · 5,912 kg
54.5s
B25-0776
13 Sep 2025 · BL-01, Anthony Jarvis
SAK-CZC70 · 5,888 kg
54.1s
-0.4 on the job before
B25-0766
16 Sep 2025 · BL-01, Tui Faletau
SAK-CZC70 · 5,932 kg
54.4s
WO-2025-0776 ran on BL-01 under Anthony Jarvis.