Works order WO-2026-0304 INT-CZB40 · 16,000 kg
July 2026 close · posted live Mon 3 Aug 2026

WO-2026-0304

Completed Make to stock Batch B26-0304

INT-CZB40, Ca/Zn base pre-blend, one-pack platform. 16,000 kg planned, started 07 Jun 2026, due 09 Jun 2026, operator Tui Faletau.

Materials issued

$77,198

4 components out of 1310

Labour & plant recovered

$2,244

6.6 hours across 1 work centres

Overhead applied

$942

42% of recovery

Carried in 1320 WIP

$80,385

$5.09/kg made

Formulation Rev 6 approved 14 Oct 2025 by Amir Haddad

Issued against this works order, with the supplier lot recorded on every line, which is the backward half of a trace.

Raw material kg / tonne Required Lot Cost /kg Value
INT-CAST70
Calcium stearate, own manufacture, blending grade · Own calcium stearate, made on the stearate line
457 7,312 RED-2410548 $3.40 $24,861
RM-5010
Polyethylene wax, 100 mPa·s · External lubricant
253 4,048 SAS-2512322 $4.26 $17,244
RM-3010
Hydrotalcite, synthetic, Mg-Al · HCl scavenger
164 2,624 KIS-2604816 $9.64 $25,295
RM-2020
Zinc oxide, French process, 99.7% · Zinc source, early colour
126 2,016 ZIB-2504428 $4.86 $9,798
Material cost $77,198

Routing

Each step recovers its work centre's rate for the hours run, and overhead is applied on top. That is the conversion cost inside WIP.

Seq Work centre Operation Hours Rate /hr Recovered
10 BL-01
High-speed Blender 1 (one packs)
Charge and blend to a homogeneous base, held in silo 6.6 $340.00 $2,244

Quality release · One-pack stabiliser release

Recorded 09 Jun 2026 by Priya Raman. Run at the end of manufacture, before the goods can be receipted into finished goods.

Pass
Test Result Specification Outcome
Yield 99.71 % 97.5-100 % Within spec
Peak temperature 135.4 °C 128-142 °C Within spec
Fusion time 54.3 s 52.4-55.6 s Within spec
Torque, peak 42.0 Nm 40.7-43.3 Nm Within spec
Colour, initial ΔE 1.32 ΔE 0-3.5 ΔE Within spec
Bulk density 307 g/L 260-400 g/L Within spec
Moisture 0.45 % 0-1.5 % Within spec
Texture, visual 1 pass Within spec

Standard cost

Computed from the formulation and the routing, not typed in. It is what the finished goods control account is debited at.

Material /kg
$4.82
Conversion /kg
$0.20
Standard /kg
$5.02

Yield

Planned
16,000 kg
Made
15,791 kg
Formulation standard
99.7%
Actual
98.69%
Variance to 5400
$1,114

Released as batch B26-0304

15,791 kg made, 1,212 kg still on the floor at the Main Store. Best before 07 Jun 2028.

Full trace →

Ledger effect

DR 1320 Work in Process Control, as material is issued and hours are booked

CR 1310 Raw Materials Control

DR 1330 Finished Goods Control, on a quality release, at standard

DR/CR 5400 Yield Variance, the difference

DR 1350 Quarantined Stock, on a failure, instead of 1330

Each line posts at the moment of the transaction it belongs to.