Works order WO-2026-0371 Demo ACE-ZNS10 · 8,000 kg
July 2026 close · posted live Mon 3 Aug 2026

WO-2026-0371

Completed Make to order Batch B26-0371

ACE-ZNS10, ACE-ZNS 10 · zinc stearate, PVC & rubber grade. 8,000 kg planned, started 09 Jul 2026, due 11 Jul 2026, operator Tui Faletau.

Materials issued

$24,237

3 components out of 1310

Labour & plant recovered

$5,600

22.3 hours across 3 work centres

Overhead applied

$2,352

42% of recovery

Carried in 1320 WIP

$32,189

$4.11/kg made

Formulation Rev 9 approved 11 Mar 2025 by Amir Haddad

Issued against this works order, with the supplier lot recorded on every line, which is the backward half of a trace.

Raw material kg / tonne Required Lot Cost /kg Value
RM-1010
Stearic acid, triple pressed, vegetable
762 6,096 KLK-2410152 $2.48 $15,118
RM-2020
Zinc oxide, French process, 99.7% · Direct fusion with ZnO
226 1,808 ZIB-2601955 $4.86 $8,787
RM-6040
Precipitated silica, anti-caking
12 96 SIB-2502705 $3.46 $332
Material cost $24,237

Routing

Each step recovers its work centre's rate for the hours run, and overhead is applied on top. That is the conversion cost inside WIP.

Seq Work centre Operation Hours Rate /hr Recovered
10 RX-01
Reaction Vessel 1 (fusion)
Direct fusion with stearic acid at 135°C 6.9 $380.00 $2,622
20 DR-02
Flash Dryer
Flash dry and cool 12.9 $195.00 $2,516
30 PK-01
Packing Line (20 kg sacks & 500 kg FIBC)
Pack to 500 kg FIBC / 20 kg sack 2.5 $185.00 $463

Quality release · Metallic stearate release

Recorded 11 Jul 2026 by Karen Doust. Precipitated and fused stearates. Metal content and sieve residue decide the grade.

Pass
Test Result Specification Outcome
Yield 99.42 % 97.5-100 % Within spec
Peak temperature 134.2 °C 128-142 °C Within spec
Metal content 6.97 % 6.2-7.4 % Within spec
Moisture 0.54 % 0-1.5 % Within spec
Bulk density 305 g/L 260-400 g/L Within spec
Sieve residue 75 µm 0.11 % 0-0.5 % Within spec
Melting point 156.0 °C 145-165 °C Within spec
Free fatty acid 0.52 % 0-1.2 % Within spec

Standard cost

Computed from the formulation and the routing, not typed in. It is what the finished goods control account is debited at.

Material /kg
$3.03
Conversion /kg
$0.99
Standard /kg
$4.02
List /kg
$6.43
Margin at list
37.5%

Yield

Planned
8,000 kg
Made
7,833 kg
Formulation standard
98.5%
Actual
97.91%
Variance to 5400
$700

Released as batch B26-0371

7,833 kg made, 1,174 kg still on the floor at the Main Store. Best before 09 Jul 2028.

Full trace →

Ledger effect

DR 1320 Work in Process Control, as material is issued and hours are booked

CR 1310 Raw Materials Control

DR 1330 Finished Goods Control, on a quality release, at standard

DR/CR 5400 Yield Variance, the difference

DR 1350 Quarantined Stock, on a failure, instead of 1330

Each line posts at the moment of the transaction it belongs to.