SUNACE
SUNACE
QC bench · WO-2026-0448 SAK-CZP30 · 11,940 kg
July 2026 close · posted live Mon 3 Aug 2026
← Quality Control

WO-2026-0448

Awaiting QC One-pack stabiliser release

SAK-CZP30, SAK-CZP 30 · Ca/Zn one pack, pressure pipe. 11,940 kg manufactured against a 12,000 kg works order, operator Tui Faletau, sampled by the laboratory. $60,887 is sitting in 1320 Work in Process and cannot move until this is called.

One-pack stabiliser release · QP-ONEPACK

Run at the end of manufacture, before the goods can be receipted into finished goods.

Yield

Specification 97.5-100 % · target 99.4

% Within spec

Peak temperature

Specification 128-142 °C · target 135

°C Within spec

Fusion time

Specification 52.4-55.6 s · target 54

s Within spec

Torque, peak

Specification 40.7-43.3 Nm · target 42

Nm Within spec

Colour, initial ΔE

Specification 0-3.5 ΔE · target 1.6

ΔE Within spec

Bulk density

Specification 260-400 g/L · target 320

g/L Within spec

Moisture

Specification 0-1.5 % · target 0.6

% Within spec

Texture, visual

Visual against the retained standard

Within spec

Results keyed by the laboratory. Calling it is the transfer of work in process into finished goods: a pass receipts the batch into the Main Store, a fail moves it to Quarantine. Either way the ledger posts at the moment you press it.

What pressing Pass does

  1. 1 Mints batch B26-0442 against this works order.
  2. 2 Receipts 11,940 kg of SAK-CZP30 into the Main Store at the standard cost of $5.07/kg.
  3. 3 Clears $60,887 out of 1320 Work in Process.
  4. 4 Posts the unfavourable yield variance of $351 to 5400.
  5. 5 Allocates the batch to SO-26-1184 for Iplex Pipelines Australia Pty Ltd, which stops being short.
  6. 6 Writes the journal at the same moment, against 1330, 5400 and 1320.

The journal it will write

1330 Finished Goods Control DR $60,536
5400 Yield Variance DR $351
1320 Work in Process Control CR $60,887

On a fail the same $60,887 moves to 1350 Quarantined Stock instead, and the batch is flagged so it can never be picked.

What is in WIP now

Materials
$50,544
Labour & plant
$7,284
Overhead
$3,059
Total
$60,887
Cost per kg made
$5.10
Standard per kg
$5.07
Yield
99.50%
Open the works order →