WO-2026-0448
Awaiting QC One-pack stabiliser releaseSAK-CZP30, SAK-CZP 30 · Ca/Zn one pack, pressure pipe. 11,940 kg manufactured against a 12,000 kg works order, operator Tui Faletau, sampled by the laboratory. $59,503 is sitting in 1320 Work in Process and cannot move until this is called.
One-pack stabiliser release · QP-ONEPACK
Run at the end of manufacture, before the goods can be receipted into finished goods.
Yield
Specification 97.5-100 % · target 99.4
Peak temperature
Specification 128-142 °C · target 135
Fusion time
Specification 42-68 s · target 54
Colour, initial ΔE
Specification 0-3.5 ΔE · target 1.6
Bulk density
Specification 260-400 g/L · target 320
Moisture
Specification 0-1.5 % · target 0.6
Texture, visual
Visual against the retained standard
Results keyed by the laboratory. Calling it is the transfer of work in process into finished goods: a pass receipts the batch into the Main Store, a fail moves it to Quarantine. Either way the ledger posts at the moment you press it.
What pressing Pass does
- 1 Mints batch B26-0442 against this works order.
- 2 Receipts 11,940 kg of SAK-CZP30 into the Main Store at the standard cost of $4.96/kg.
- 3 Clears $59,503 out of 1320 Work in Process.
- 4 Posts the unfavourable yield variance of $281 to 5400.
- 5 Allocates the batch to SO-26-1184 for Iplex Pipelines Australia Pty Ltd, which stops being short.
- 6 Writes the journal at the same moment, against 1330, 5400 and 1320.
The journal it will write
| 1330 Finished Goods Control | DR $59,222 |
| 5400 Yield Variance | DR $281 |
| 1320 Work in Process Control | CR $59,503 |
On a fail the same $59,503 moves to 1350 Quarantined Stock instead, and the batch is flagged so it can never be picked.
What is in WIP now
- Materials
- $49,160
- Labour & plant
- $7,284
- Overhead
- $3,059
- Total
- $59,503
- Cost per kg made
- $4.98
- Standard per kg
- $4.96
- Yield
- 99.50%