SUNACE
SUNACE
Process Control ACE-LIS10 · Yield
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Process Control

Every release of a grade against the customer specification and against Sun Ace's own action limits, the moment QC closes the batch.

Newest release

B26-0381 ACE-LIS 10 · lithium stearate, grease & lubricant · 1,463 kg made 08 Jul 2026 Pass

Closed by Priya Raman at 10:26am · 26 days ago · WO-2026-0381

316 kg still on the rack, 1,147 kg already gone .

Releases plotted

28

02 Aug 2025 to 08 Jul 2026

Yield · published grade

Inside spec, outside our limits

0

Every release sat inside the action limits

Nothing to check

Outside the customer spec

0

No release broke the specification

Clean

The line

No comparison

Only 1 release in the last week of production

Widen the window

Every measure on the release

Pick one to open it below. Bands as drawn on the big chart.

ACE-LIS 10 · lithium stearate, grease & lubricant · Yield

Customer specification 97.50 to 100.00% from the QP-STEARATE plan. Action limits 98.26 to 99.76, the middle 60% of the customer window, measured out from target.

Inside the action limits Inside the customer spec, outside our limits Outside the customer spec
Reading
97.0 97.5 98.0 98.5 99.0 99.5 100.0 100.5 Yield (%) Customer spec 100.00 Action limit 99.76 Target 99.40 Action limit 98.26 Customer spec 97.50 B25-0725 · 99.13% B25-0748 · 99.54% B25-0739 · 99.38% B25-0731 · 99.19% B25-0726 · 99.01% B25-0751 · 99.23% B25-0786 · 99.27% B25-0814 · 99.11% B25-0837 · 99.27% B25-0887 · 99.33% B25-0849 · 99.76% B25-0874 · 99.29% B25-0920 · 99.34% B26-0098 · 99.12% B26-0090 · 99.17% B26-0102 · 99.31% B26-0184 · 99.70% B26-0165 · 99.55% B26-0199 · 99.72% B26-0183 · 99.35% B26-0232 · 99.02% B26-0217 · 99.56% B26-0280 · 99.29% B26-0262 · 99.74% B26-0283 · 99.62% B26-0271 · 99.22% B26-0302 · 99.39% B26-0381 · 99.26% Aug 25 Sep 25 Oct 25 Nov 25 Dec 25 Jan 26 Mar 26 Apr 26 May 26 Jun 26 Jul 26 Releases in the order they were made, oldest at the left 9 between 99.00 and 99.25% 11 between 99.25 and 99.50% 7 between 99.50 and 99.75% 1 between 99.75 and 100.00% 0 5 10 15 Releases per 0.25% band

28 releases of ACE-LIS10 · 0 inside the customer specification but outside the action limits · 0 outside the specification · widest reading 99.76%, narrowest 99.01%.

Worth a look

Releases outside the action limits, newest first, with what is still on the rack.

Every release of ACE-LIS10 sat inside the action limits on Yield.

Is the line getting skinnier

How much of the customer window the releases occupy, measured back from the last run on 08 Jul 2026.

Window Releases Lowest Highest Window used
Last week of production 1 99.26 99.26 Too few
Last month 2 99.26 99.39 Too few
Last two months 6 99.22 99.74
21%

Too few releases in the last week of production to read against the two-month baseline.

The readings

The charts above as numbers, newest first. ◆ past our action limits, ■ outside the customer specification.

Download CSV
Batch Made Yield
%
Peak temperature
°C
Metal content
%
Moisture
%
Bulk density
g/L
Sieve residue 75 µm
%
Melting point
°C
Free fatty acid
%
Verdict
B26-0381 08 Jul 2026 99.26 134.8 6.61 0.40 298 0.11 153.3 0.44 Pass
B26-0302 21 Jun 2026 99.39 135.0 6.81 0.42 311 0.12 152.3 0.50 Pass
B26-0271 17 May 2026 99.22 135.2 6.94 0.59 340 0.17 152.6 0.32 Pass
B26-0283 14 May 2026 99.62 135.5 6.71 0.70 332 0.18 157.2 0.61 Pass
B26-0262 14 May 2026 99.74 135.9 6.94 0.38 324 0.07 151.9 0.39 Pass
B26-0280 11 May 2026 99.29 135.3 6.94 0.48 307 0.11 153.4 0.46 Pass
B26-0217 05 Apr 2026 99.56 134.2 6.89 0.81 340 0.10 156.6 0.43 Pass
B26-0232 03 Apr 2026 99.02 144.0 ■ 6.87 0.74 340 0.15 155.0 0.55 Fail
B26-0183 17 Mar 2026 99.35 133.6 6.93 0.52 342 0.16 156.2 0.49 Pass
B26-0199 11 Mar 2026 99.72 135.8 6.84 0.69 317 0.11 157.3 0.47 Pass
B26-0165 09 Mar 2026 99.55 135.9 6.69 0.58 340 0.05 155.4 0.55 Concession
B26-0184 03 Mar 2026 99.70 134.7 6.62 0.51 307 0.13 152.3 0.61 Pass
B26-0102 13 Jan 2026 99.31 135.1 6.81 0.77 333 0.10 152.5 0.61 Pass
B26-0090 09 Jan 2026 99.17 133.0 6.94 0.68 339 0.15 156.6 0.31 Pass
B26-0098 03 Jan 2026 99.12 135.0 6.72 0.39 331 0.07 156.4 0.59 Pass
B25-0920 26 Dec 2025 99.34 132.8 6.89 0.76 338 0.16 156.2 0.39 Pass
B25-0874 22 Nov 2025 99.29 135.1 6.82 0.70 332 0.16 156.2 0.35 Pass
B25-0849 22 Nov 2025 99.76 144.0 ■ 6.66 0.44 320 0.12 157.6 0.50 Fail
B25-0887 13 Nov 2025 99.33 136.5 6.74 0.74 330 0.04 154.3 0.47 Pass
B25-0837 17 Oct 2025 99.27 136.0 6.95 0.79 321 0.12 157.8 0.61 Pass
B25-0814 01 Oct 2025 99.11 133.0 6.91 0.57 323 0.10 157.4 0.59 Pass
B25-0786 25 Sep 2025 99.27 135.5 6.90 0.73 324 0.15 155.9 0.51 Pass
B25-0751 11 Sep 2025 99.23 132.9 6.62 0.46 331 0.08 158.1 0.51 Pass
B25-0726 23 Aug 2025 99.01 136.0 6.67 0.79 340 0.14 152.3 0.33 Pass
B25-0731 22 Aug 2025 99.19 137.0 6.83 0.62 331 0.12 156.0 0.57 Pass
B25-0739 19 Aug 2025 99.38 135.6 6.77 0.62 302 0.04 152.0 0.58 Pass
B25-0748 09 Aug 2025 99.54 132.8 6.73 0.54 310 0.09 157.3 0.34 Pass
B25-0725 02 Aug 2025 99.13 135.1 6.90 0.60 330 0.16 157.1 0.68 Pass