Every release of a grade against the customer specification and against Sun Ace's own action limits, the moment QC closes the batch.

Newest release

B26-0360 Ca/Zn base pre-blend, one-pack platform · 15,910 kg made 15 Jul 2026 Pass

Closed by Priya Raman at 10:18am · 19 days ago · WO-2026-0360

6,404 kg still on the rack, 9,506 kg already gone .

Releases plotted

15

07 Aug 2025 to 15 Jul 2026

Bulk density · published grade

Inside spec, outside our limits

0

Every release sat inside the action limits

Nothing to check

Outside the customer spec

0

No release broke the specification

Clean

The line

No comparison

Only 1 release in the last week of production

Widen the window

Every measure on the release

Pick one to open it below. Bands as drawn on the big chart.

Ca/Zn base pre-blend, one-pack platform · Bulk density

Customer specification 260 to 400g/L from the QP-ONEPACK plan. Action limits 284 to 368, the middle 60% of the customer window, measured out from target.

Inside the action limits Inside the customer spec, outside our limits Outside the customer spec
Reading
200 250 300 350 400 450 Bulk density (g/L) Customer spec 400 Action limit 368 Target 320 Action limit 284 Customer spec 260 B25-0701 · 333g/L B25-0720 · 324g/L B25-0771 · 303g/L B25-0798 · 309g/L B25-0769 · 319g/L B25-0813 · 307g/L B25-0847 · 341g/L B26-0138 · 335g/L B26-0142 · 301g/L B26-0139 · 322g/L B26-0129 · 303g/L B26-0166 · 333g/L B26-0304 · 307g/L B26-0320 · 315g/L B26-0360 · 337g/L Aug 25 Sep 25 Oct 25 Nov 25 Feb 26 Mar 26 Jun 26 Jul 26 Releases in the order they were made, oldest at the left 10 between 300 and 325g/L 5 between 325 and 350g/L 0 5 10 Releases per 25.0g/L band

15 releases of INT-CZB40 · 0 inside the customer specification but outside the action limits · 0 outside the specification · widest reading 341g/L, narrowest 301g/L.

Worth a look

Releases outside the action limits, newest first, with what is still on the rack.

Every release of INT-CZB40 sat inside the action limits on Bulk density.

Is the line getting skinnier

How much of the customer window the releases occupy, measured back from the last run on 15 Jul 2026.

Window Releases Lowest Highest Window used
Last week of production 1 337 337 Too few
Last month 2 315 337 Too few
Last two months 3 307 337
21%

Too few releases in the last week of production to read against the two-month baseline.

The readings

The charts above as numbers, newest first. ◆ past our action limits, ■ outside the customer specification.

Download CSV
Batch Made Yield
%
Peak temperature
°C
Fusion time
s
Torque, peak
Nm
Colour, initial ΔE
Bulk density
g/L
Moisture
%
Verdict
B26-0360 15 Jul 2026 99.57 135.8 54.0 42.4 2.12 337 0.40 Pass
B26-0320 17 Jun 2026 99.52 137.1 54.4 42.0 1.37 315 0.79 Pass
B26-0304 08 Jun 2026 99.71 135.4 54.3 42.0 1.32 307 0.45 Pass
B26-0166 14 Mar 2026 99.62 136.2 53.6 42.4 1.05 333 0.83 Pass
B26-0129 13 Feb 2026 99.46 133.3 54.1 42.0 1.50 303 0.70 Pass
B26-0139 10 Feb 2026 99.40 134.8 54.2 42.2 1.53 322 0.47 Pass
B26-0142 06 Feb 2026 99.76 135.1 53.7 42.0 1.79 301 0.62 Pass
B26-0138 06 Feb 2026 99.12 133.7 54.0 42.2 1.27 335 0.41 Pass
B25-0847 04 Nov 2025 99.07 136.6 53.8 42.2 1.11 341 0.67 Pass
B25-0813 24 Oct 2025 99.36 134.8 54.1 42.2 1.73 307 0.74 Pass
B25-0769 10 Sep 2025 99.46 136.6 54.3 41.8 1.22 319 0.78 Pass
B25-0798 09 Sep 2025 99.69 133.5 54.4 41.6 1.32 309 0.54 Pass
B25-0771 07 Sep 2025 99.33 135.3 54.2 42.1 1.93 303 0.64 Pass
B25-0720 11 Aug 2025 99.34 135.1 54.2 42.2 1.75 324 0.39 Pass
B25-0701 07 Aug 2025 99.26 136.4 54.1 41.8 1.63 333 0.49 Pass