SUNACE
SUNACE
Process Control INT-CZB40 · Yield
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Process Control

Every release of a grade against the customer specification and against Sun Ace's own action limits, the moment QC closes the batch.

Newest release

B26-0360 Ca/Zn base pre-blend, one-pack platform · 15,910 kg made 15 Jul 2026 Pass

Closed by Priya Raman at 10:18am · 19 days ago · WO-2026-0360

6,404 kg still on the rack, 9,506 kg already gone .

Releases plotted

15

07 Aug 2025 to 15 Jul 2026

Yield · published grade

Inside spec, outside our limits

0

Every release sat inside the action limits

Nothing to check

Outside the customer spec

0

No release broke the specification

Clean

The line

No comparison

Only 1 release in the last week of production

Widen the window

Every measure on the release

Pick one to open it below. Bands as drawn on the big chart.

Ca/Zn base pre-blend, one-pack platform · Yield

Customer specification 97.50 to 100.00% from the QP-ONEPACK plan. Action limits 98.26 to 99.76, the middle 60% of the customer window, measured out from target.

Inside the action limits Inside the customer spec, outside our limits Outside the customer spec
Reading
97.0 97.5 98.0 98.5 99.0 99.5 100.0 100.5 Yield (%) Customer spec 100.00 Action limit 99.76 Target 99.40 Action limit 98.26 Customer spec 97.50 B25-0701 · 99.26% B25-0720 · 99.34% B25-0771 · 99.33% B25-0798 · 99.69% B25-0769 · 99.46% B25-0813 · 99.36% B25-0847 · 99.07% B26-0138 · 99.12% B26-0142 · 99.76% B26-0139 · 99.40% B26-0129 · 99.46% B26-0166 · 99.62% B26-0304 · 99.71% B26-0320 · 99.52% B26-0360 · 99.57% Aug 25 Sep 25 Oct 25 Nov 25 Feb 26 Mar 26 Jun 26 Jul 26 Releases in the order they were made, oldest at the left 2 between 99.00 and 99.25% 7 between 99.25 and 99.50% 5 between 99.50 and 99.75% 1 between 99.75 and 100.00% 0 5 10 Releases per 0.25% band

15 releases of INT-CZB40 · 0 inside the customer specification but outside the action limits · 0 outside the specification · widest reading 99.76%, narrowest 99.07%.

Worth a look

Releases outside the action limits, newest first, with what is still on the rack.

Every release of INT-CZB40 sat inside the action limits on Yield.

Is the line getting skinnier

How much of the customer window the releases occupy, measured back from the last run on 15 Jul 2026.

Window Releases Lowest Highest Window used
Last week of production 1 99.57 99.57 Too few
Last month 2 99.52 99.57 Too few
Last two months 3 99.52 99.71
8%

Too few releases in the last week of production to read against the two-month baseline.

The readings

The charts above as numbers, newest first. ◆ past our action limits, ■ outside the customer specification.

Download CSV
Batch Made Yield
%
Peak temperature
°C
Fusion time
s
Torque, peak
Nm
Colour, initial ΔE
Bulk density
g/L
Moisture
%
Verdict
B26-0360 15 Jul 2026 99.57 135.8 54.0 42.4 2.12 337 0.40 Pass
B26-0320 17 Jun 2026 99.52 137.1 54.4 42.0 1.37 315 0.79 Pass
B26-0304 08 Jun 2026 99.71 135.4 54.3 42.0 1.32 307 0.45 Pass
B26-0166 14 Mar 2026 99.62 136.2 53.6 42.4 1.05 333 0.83 Pass
B26-0129 13 Feb 2026 99.46 133.3 54.1 42.0 1.50 303 0.70 Pass
B26-0139 10 Feb 2026 99.40 134.8 54.2 42.2 1.53 322 0.47 Pass
B26-0142 06 Feb 2026 99.76 135.1 53.7 42.0 1.79 301 0.62 Pass
B26-0138 06 Feb 2026 99.12 133.7 54.0 42.2 1.27 335 0.41 Pass
B25-0847 04 Nov 2025 99.07 136.6 53.8 42.2 1.11 341 0.67 Pass
B25-0813 24 Oct 2025 99.36 134.8 54.1 42.2 1.73 307 0.74 Pass
B25-0769 10 Sep 2025 99.46 136.6 54.3 41.8 1.22 319 0.78 Pass
B25-0798 09 Sep 2025 99.69 133.5 54.4 41.6 1.32 309 0.54 Pass
B25-0771 07 Sep 2025 99.33 135.3 54.2 42.1 1.93 303 0.64 Pass
B25-0720 11 Aug 2025 99.34 135.1 54.2 42.2 1.75 324 0.39 Pass
B25-0701 07 Aug 2025 99.26 136.4 54.1 41.8 1.63 333 0.49 Pass