SUNACE
SUNACE
Process Control SAK-CZB65 · Peak temperature
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Process Control

Every release of a grade against the customer specification and against Sun Ace's own action limits, the moment QC closes the batch.

Newest release

B26-0441 SAK-CZB 65 · Ca/Zn one pack, bottle closure, low taint · 1,980 kg made 30 Jul 2026 Fail

Closed by Karen Doust at 3:22pm · 4 days ago · WO-2026-0447

1,980 kg still on the rack, 0 kg already gone .

Releases plotted

13

03 Sep 2025 to 30 Jul 2026

Peak temperature · published grade

Inside spec, outside our limits

0

Every release sat inside the action limits

Nothing to check

Outside the customer spec

0

No release broke the specification

Clean

The line

No comparison

Only 1 release in the last week of production

Widen the window

Every measure on the release

Pick one to open it below. Bands as drawn on the big chart.

SAK-CZB 65 · Ca/Zn one pack, bottle closure, low taint · Peak temperature

Customer specification 128.0 to 142.0°C from the QP-FOODCONTACT plan. Action limits 130.8 to 139.2, the middle 60% of the customer window, measured out from target.

Inside the action limits Inside the customer spec, outside our limits Outside the customer spec
Reading
125 130 135 140 145 Peak temperature (°C) Customer spec 142.0 Action limit 139.2 Target 135.0 Action limit 130.8 Customer spec 128.0 B25-0784 · 137.0°C B25-0880 · 133.2°C B25-0846 · 133.5°C B25-0900 · 134.3°C B25-0922 · 134.3°C B26-0072 · 134.1°C B26-0095 · 135.1°C B26-0169 · 133.9°C B26-0185 · 132.8°C B26-0187 · 135.9°C B26-0193 · 136.5°C B26-0261 · 135.8°C B26-0441 · 137.2°C Sep 25 Nov 25 Dec 25 Jan 26 Mar 26 May 26 Jul 26 Releases in the order they were made, oldest at the left 7 between 132.5 and 135.0°C 6 between 135.0 and 137.5°C 0 5 10 Releases per 2.5°C band

13 releases of SAK-CZB65 · 0 inside the customer specification but outside the action limits · 0 outside the specification · widest reading 137.2°C, narrowest 132.8°C.

Worth a look

Releases outside the action limits, newest first, with what is still on the rack.

Every release of SAK-CZB65 sat inside the action limits on Peak temperature.

Is the line getting skinnier

How much of the customer window the releases occupy, measured back from the last run on 30 Jul 2026.

Window Releases Lowest Highest Window used
Last week of production 1 137.2 137.2 Too few
Last month 1 137.2 137.2 Too few
Last two months 1 137.2 137.2 Too few

Too few releases in the last week of production to read against the two-month baseline.

The readings

The charts above as numbers, newest first. ◆ past our action limits, ■ outside the customer specification.

Download CSV
Batch Made Yield
%
Peak temperature
°C
Fusion time
s
Torque, peak
Nm
Metal content
%
Moisture
%
Heavy metals
ppm
Assay
%
Sieve residue 75 µm
%
Verdict
B26-0441 30 Jul 2026 99.00 137.2 57.4 ■ 44.9 ■ 6.74 0.71 2.4 99.40 0.14 Fail
B26-0261 22 May 2026 99.64 135.8 —— 6.78 0.83 1.3 99.35 0.03 Pass
B26-0193 21 Mar 2026 99.04 136.5 —— 6.92 0.54 1.9 99.41 0.07 Pass
B26-0187 16 Mar 2026 99.28 135.9 —— 6.89 0.47 0.7 100.06 0.04 Pass
B26-0185 06 Mar 2026 99.19 132.8 —— 6.82 0.49 1.1 99.84 0.06 Pass
B26-0169 02 Mar 2026 99.58 133.9 —— 6.87 0.63 3.4 99.40 0.09 Pass
B26-0095 23 Jan 2026 99.31 135.1 —— 6.99 0.70 3.1 99.44 0.09 Pass
B26-0072 05 Jan 2026 99.26 134.1 —— 6.76 0.67 2.1 99.38 0.02 Pass
B25-0922 16 Dec 2025 99.50 134.3 —— 6.95 0.44 2.3 99.60 0.09 Pass
B25-0900 05 Dec 2025 99.39 134.3 —— 6.89 0.80 3.5 99.56 0.15 Pass
B25-0846 25 Nov 2025 99.40 133.5 —— 6.83 0.45 1.6 99.28 0.04 Pass
B25-0880 04 Nov 2025 99.69 133.2 —— 6.63 0.51 2.3 99.26 0.06 Concession
B25-0784 03 Sep 2025 99.70 137.0 —— 6.91 0.65 3.6 100.02 0.10 Pass