Process Control SAK-CZS10 · Yield
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Process Control

Every release of a grade against the customer specification and against Sun Ace's own action limits, the moment QC closes the batch.

Newest release

B26-0318 SAK-CZS 10 · Ca/Zn one pack, calendered rigid sheet · 4,941 kg made 23 Jun 2026 Pass

Closed by Priya Raman at 10:22am · 41 days ago · WO-2026-0318

877 kg still on the rack, 4,064 kg already gone .

Releases plotted

25

10 Aug 2025 to 23 Jun 2026

Yield · published grade

Inside spec, outside our limits

1

Most recent B26-0118 on 05 Feb 2026

Sellable, worth a look before it goes

Outside the customer spec

0

No release broke the specification

Clean

The line

No comparison

Only 1 release in the last week of production

Widen the window

Every measure on the release

Pick one to open it below. Bands as drawn on the big chart.

SAK-CZS 10 · Ca/Zn one pack, calendered rigid sheet · Yield

Customer specification 97.50 to 100.00% from the QP-ONEPACK plan. Action limits 98.26 to 99.76, the middle 60% of the customer window, measured out from target.

Inside the action limits Inside the customer spec, outside our limits Outside the customer spec
Reading
97.0 97.5 98.0 98.5 99.0 99.5 100.0 100.5 Yield (%) Customer spec 100.00 Action limit 99.76 Target 99.40 Action limit 98.26 Customer spec 97.50 B25-0703 · 99.04% B25-0705 · 99.70% B25-0735 · 99.06% B25-0797 · 99.63% B25-0819 · 99.62% B25-0825 · 99.14% B25-0889 · 99.56% B25-0932 · 99.41% B25-0927 · 99.30% B25-0897 · 99.39% B25-0939 · 99.10% B26-0081 · 99.20% B26-0078 · 99.29% B26-0094 · 99.36% B26-0118 · 99.78% · inside the customer specification, outside the action limits B26-0150 · 99.61% B26-0144 · 99.17% B26-0154 · 99.18% B26-0174 · 99.71% B26-0227 · 99.09% B26-0247 · 99.06% B26-0289 · 99.42% B26-0256 · 99.66% B26-0305 · 99.63% B26-0318 · 99.19% Aug 25 Sep 25 Oct 25 Nov 25 Dec 25 Jan 26 Feb 26 Mar 26 Apr 26 May 26 Jun 26 Releases in the order they were made, oldest at the left 10 between 99.00 and 99.25% 6 between 99.25 and 99.50% 8 between 99.50 and 99.75% 1 between 99.75 and 100.00% 0 5 10 Releases per 0.25% band

25 releases of SAK-CZS10 · 1 inside the customer specification but outside the action limits · 0 outside the specification · widest reading 99.78%, narrowest 99.04%.

Worth a look

Releases outside the action limits, newest first, with what is still on the rack.

Batch Yield State Stock
B26-0118
05 Feb 2026
99.78 %
Sellable, past our limit
0.02% past it · 63% of the way to the customer limit
294 kg on hand
4,137 kg gone to Advanced Polymer Industries Pty Ltd, Poliveneta S.r.l.

Is the line getting skinnier

How much of the customer window the releases occupy, measured back from the last run on 23 Jun 2026.

Window Releases Lowest Highest Window used
Last week of production 1 99.19 99.19 Too few
Last month 2 99.19 99.63 Too few
Last two months 4 99.19 99.66
19%

Too few releases in the last week of production to read against the two-month baseline.

The readings

The charts above as numbers, newest first. ◆ past our action limits, ■ outside the customer specification.

Download CSV
Batch Made Yield
%
Peak temperature
°C
Fusion time
s
Torque, peak
Nm
Colour, initial ΔE
Bulk density
g/L
Moisture
%
Verdict
B26-0318 23 Jun 2026 99.19 133.4 53.7 41.9 1.85 312 0.71 Pass
B26-0305 10 Jun 2026 99.63 134.3 53.7 41.9 1.25 342 0.44 Pass
B26-0256 20 May 2026 99.66 135.6 53.9 42.1 1.69 336 0.48 Pass
B26-0289 18 May 2026 99.42 135.1 53.8 42.0 2.15 323 0.70 Pass
B26-0247 14 Apr 2026 99.06 137.0 54.1 41.7 2.15 310 0.74 Pass
B26-0227 06 Apr 2026 99.09 136.4 54.4 42.4 1.15 328 0.40 Pass
B26-0174 14 Mar 2026 99.71 132.9 53.8 42.1 1.62 305 0.60 Pass
B26-0154 05 Mar 2026 99.18 135.4 54.3 42.0 1.76 317 0.47 Pass
B26-0144 12 Feb 2026 99.17 136.3 54.4 42.4 1.64 325 0.81 Pass
B26-0150 11 Feb 2026 99.61 136.4 54.1 41.7 2.06 302 0.43 Pass
B26-0118 05 Feb 2026 99.78 ◆ 134.4 53.8 42.2 1.73 305 0.49 Pass
B26-0094 18 Jan 2026 99.36 135.3 54.5 42.0 2.14 330 0.73 Pass
B26-0078 16 Jan 2026 99.29 132.9 53.7 42.3 1.95 301 0.78 Pass
B26-0081 09 Jan 2026 99.20 132.9 53.8 42.3 1.87 341 0.60 Concession
B25-0939 21 Dec 2025 99.10 136.3 54.0 42.3 1.70 309 0.54 Pass
B25-0897 16 Dec 2025 99.39 136.9 53.9 41.8 1.13 317 0.62 Pass
B25-0927 10 Dec 2025 99.30 137.2 54.2 41.8 2.01 338 0.44 Pass
B25-0932 01 Dec 2025 99.41 144.0 ■ 53.6 42.3 1.58 330 0.76 Fail
B25-0889 12 Nov 2025 99.56 136.3 54.5 41.9 1.97 307 0.76 Pass
B25-0825 15 Oct 2025 99.14 133.2 54.2 42.4 1.30 309 0.65 Pass
B25-0819 08 Oct 2025 99.62 133.6 54.1 42.2 1.12 306 0.69 Pass
B25-0797 10 Sep 2025 99.63 135.3 53.9 41.8 1.49 300 0.43 Pass
B25-0735 21 Aug 2025 99.06 133.6 54.2 41.7 1.49 332 0.44 Pass
B25-0705 19 Aug 2025 99.70 135.4 53.6 41.8 1.83 324 0.83 Pass
B25-0703 10 Aug 2025 99.04 134.2 53.8 42.2 1.18 309 0.66 Pass