Quality Trends Fusion time · 15 releases
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Quality Trends

Every release in the order it was made, against its specification limits.

Releases plotted

15

SAK-CZC 60 · Ca/Zn one pack, 70°C cable insulation

Average fusion time

54.1s

Specification 52.4 to 55.6s · target 54.0s

+0.1 against target

Outside specification

0

Every release inside its limits

Clean run

Process capability, Cpk

1.54

Comfortably inside the limits

σ 0.3s

Fusion time by batch, in the order it was made

Red bands are the specification limits, the dashed line is target.

Inside spec Near a limit Out of spec

Nothing outside the limits

Every fusion time release in this run sat inside its specification.

The biggest movement in the run

The largest change from one job to the next.

B25-0857
24 Nov 2025 · BL-01, Tui Faletau
SAK-CZC60 · 7,899 kg
54.5s
B26-0065
10 Jan 2026 · BL-01, Malcolm Rees
SAK-CZC60 · 7,940 kg
53.8s
-0.7 on the job before
B26-0061
25 Jan 2026 · BL-01, Malcolm Rees
SAK-CZC60 · 7,939 kg
53.9s
WO-2026-0065 ran on BL-01 under Malcolm Rees.