SUNACE
SUNACE
Quality Trends Texture, visual · 20 releases
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Quality Trends

Every release in the order it was made, against its specification limits.

Releases plotted

20

SAK-CZP 40 · Ca/Zn one pack, sewer & drainage pipe

Average texture, visual

1pass

Specification 1 to 1pass · target 1pass

+0 against target

Outside specification

0

Every release inside its limits

Clean run

Process capability, Cpk

0.00

Spread is wide against the limits

σ 0pass

Texture, visual by batch, in the order it was made

Red bands are the specification limits, the dashed line is target.

Inside spec Near a limit Out of spec

Nothing outside the limits

Every texture, visual release in this run sat inside its specification.

The biggest movement in the run

The largest change from one job to the next.

B25-0746
13 Aug 2025 · BL-01, Sione Naufahu
SAK-CZP40 · 11,834 kg
1pass
B25-0770
12 Sep 2025 · BL-01, Anthony Jarvis
SAK-CZP40 · 11,938 kg
1pass
+0 on the job before
B25-0785
17 Sep 2025 · BL-01, Anthony Jarvis
SAK-CZP40 · 11,913 kg
1pass
WO-2025-0770 ran on BL-01 under Anthony Jarvis.