SUNACE
SUNACE
Batch B25-0734 Demo SAK-CZP40 · 03 Aug 2025
July 2026 close · posted live Mon 3 Aug 2026
← Batch Traceability

B25-0734

Fail Quarantine

SAK-CZP40, SAK-CZP 40 · Ca/Zn one pack, sewer & drainage pipe. 11,860 kg made on 03 Aug 2025 against WO-2025-0734, 11,860 kg still on the floor, best before 03 Aug 2027.

← Backward trace

Every raw material lot consumed into this batch, and the supplier it came from. If a supplier recalls a lot, this is the list of batches it touched.

Raw material Supplier lot Supplier kg
RM-5040
Calcium stearate, bought-in, blending grade
FAC-2406895 Faci Asia Pacific Pte Ltd 2,952
RM-6014
Calcium carbonate, ground, 2 micron
OMY-2506788 Omya Australia Pty Ltd 3,432
RM-5010
Polyethylene wax, 100 mPa·s
SAS-2606124 Sasol Chemicals (Germany) GmbH 1,584
RM-3010
Hydrotalcite, synthetic, Mg-Al
KIS-2609472 Kisuma Chemicals B.V. 984
RM-2020
Zinc oxide, French process, 99.7%
ZIB-2405176 Zibo Xiangrun Chemical Co. Ltd 744
RM-5020
Paraffin wax 58/60, fully refined
SAS-2607887 Sasol Chemicals (Germany) GmbH 816
RM-3040
Pentaerythritol, mono, 98%
SIN-2501878 Sinochem Plastics Co. Ltd 504
RM-3050
Epoxidised soybean oil, ESBO
CHE-2604152 Chemiplas Australia Pty Ltd 408
RM-4010
Phenolic antioxidant 1010, bulk
SON-2401879 Songwon Industrial Co. Ltd 120
RM-3020
Sodium perchlorate, 60% solution
CHE-2605861 Chemiplas Australia Pty Ltd 72
Charged into the batch 11,616 kg

Forward trace →

Every despatch this batch went out on. If a customer raises a complaint against a batch number, this is who else received it.

Nothing shipped: the batch failed release and is segregated in Quarantine.

Release record · One-pack stabiliser release

Tested 04 Aug 2025 by Karen Doust. Run at the end of manufacture, before the goods can be receipted into finished goods.

Fail
Yield 99.43 % 97.5-100
Peak temperature 144.0 °C 128-142
Fusion time 51 s 42-68
Colour, initial ΔE 2.12 ΔE 0-3.5
Bulk density 326 g/L 260-400
Moisture 0.56 % 0-1.5
Texture, visual Pass visual

Out of specification. Batch transferred to Quarantine pending a rework or concession decision.