SUNACE
SUNACE
Process Control ACEGUARD-HT8 · Sieve residue 75 µm
July 2026 close · posted live Mon 3 Aug 2026

Manufacturing

Process Control

Every release of a grade against the customer specification and against Sun Ace's own action limits, the moment QC closes the batch.

Newest release

B26-0390 ACEGUARD HT 8 · hydrotalcite co-stabiliser blend · 2,468 kg made 23 Jul 2026 Pass

Closed by Priya Raman at 10:52am · 11 days ago · WO-2026-0390

1,063 kg still on the rack, 1,405 kg already gone to Tycab Australia Pty Ltd.

Releases plotted

32

15 Aug 2025 to 23 Jul 2026

Sieve residue 75 µm · published grade

Inside spec, outside our limits

0

Every release sat inside the action limits

Nothing to check

Outside the customer spec

0

No release broke the specification

Clean

The line

No comparison

Only 2 releases in the last week of production

Widen the window

Every measure on the release

Pick one to open it below. Bands as drawn on the big chart.

ACEGUARD HT 8 · hydrotalcite co-stabiliser blend · Sieve residue 75 µm

Customer specification 0.00 to 0.50% from the QP-STEARATE plan. Action limits 0.00 to 0.34, 60% of the way from target up to the customer limit, with no lower limit on a not-more-than test.

Inside the action limits Inside the customer spec, outside our limits Outside the customer spec
Reading

32 releases of ACEGUARD-HT8 · 0 inside the customer specification but outside the action limits · 0 outside the specification · widest reading 0.18%, narrowest 0.02%.

Worth a look

Releases outside the action limits, newest first, with what is still on the rack.

Every release of ACEGUARD-HT8 sat inside the action limits on Sieve residue 75 µm.

Is the line getting skinnier

How much of the customer window the releases occupy, measured back from the last run on 23 Jul 2026.

Window Releases Lowest Highest Window used
Last week of production 2 0.15 0.15 Too few
Last month 2 0.15 0.15 Too few
Last two months 5 0.07 0.15
16%

Too few releases in the last week of production to read against the two-month baseline.

The readings

The charts above as numbers, newest first. ◆ past our action limits, ■ outside the customer specification.

Download CSV
Batch Made Yield
%
Peak temperature
°C
Metal content
%
Moisture
%
Bulk density
g/L
Sieve residue 75 µm
%
Melting point
°C
Free fatty acid
%
Verdict
B26-0390 23 Jul 2026 99.80 ◆ 134.3 6.94 0.49 324 0.15 154.0 0.60 Pass
B26-0346 18 Jul 2026 99.42 133.8 6.86 0.66 339 0.15 152.8 0.51 Pass
B26-0335 13 Jun 2026 99.77 ◆ 134.9 6.61 0.51 318 0.07 156.9 0.42 Pass
B26-0341 06 Jun 2026 99.45 134.1 6.96 0.78 307 0.10 154.7 0.69 Concession
B26-0301 04 Jun 2026 99.62 133.3 6.62 0.58 307 0.11 154.4 0.35 Pass
B26-0292 17 May 2026 99.42 132.9 6.81 0.44 319 0.08 156.2 0.61 Pass
B26-0272 03 May 2026 99.25 133.3 6.96 0.70 299 0.06 153.9 0.31 Pass
B26-0177 22 Mar 2026 99.46 133.7 6.62 0.45 341 0.17 152.6 0.65 Pass
B26-0172 10 Mar 2026 99.01 135.6 6.63 0.47 300 0.08 157.4 0.65 Pass
B26-0175 09 Mar 2026 99.36 133.6 6.70 0.41 320 0.14 157.4 0.65 Pass
B26-0130 13 Feb 2026 99.57 132.8 6.89 0.47 326 0.16 154.9 0.65 Pass
B26-0116 09 Feb 2026 99.31 134.4 6.71 0.51 315 0.03 155.7 0.40 Pass
B26-0068 18 Jan 2026 99.35 135.1 6.88 0.73 300 0.04 152.3 0.43 Pass
B26-0107 11 Jan 2026 99.00 135.9 6.67 0.71 338 0.06 154.7 0.41 Pass
B26-0084 04 Jan 2026 99.21 135.1 6.62 0.80 318 0.02 155.2 0.51 Pass
B25-0933 25 Dec 2025 99.26 135.1 6.62 0.69 338 0.07 157.8 0.34 Pass
B25-0924 19 Dec 2025 99.11 136.7 6.65 0.66 320 0.17 154.1 0.53 Pass
B25-0898 14 Dec 2025 99.63 134.7 6.99 0.44 336 0.06 157.1 0.38 Pass
B25-0908 13 Dec 2025 99.30 136.8 6.70 0.39 316 0.14 156.0 0.35 Pass
B25-0930 08 Dec 2025 99.69 135.9 6.76 0.44 306 0.14 153.2 0.35 Pass
B25-0901 08 Dec 2025 99.30 133.5 6.85 0.51 323 0.02 153.1 0.38 Pass
B25-0913 05 Dec 2025 99.34 135.4 6.92 0.60 338 0.11 157.2 0.56 Pass
B25-0906 05 Dec 2025 99.52 134.6 6.65 0.53 314 0.04 158.1 0.33 Pass
B25-0890 12 Nov 2025 99.45 133.5 6.85 0.60 303 0.18 153.5 0.43 Pass
B25-0810 24 Oct 2025 99.57 133.9 6.84 0.60 342 0.02 153.7 0.60 Pass
B25-0843 07 Oct 2025 99.72 134.1 6.82 0.45 341 0.04 154.0 0.34 Concession
B25-0772 20 Sep 2025 99.63 134.2 6.85 0.69 334 0.06 152.2 0.54 Pass
B25-0763 17 Sep 2025 99.39 133.3 6.73 0.81 320 0.13 157.8 0.34 Pass
B25-0750 14 Sep 2025 99.52 136.3 6.93 0.40 333 0.17 155.4 0.40 Pass
B25-0759 10 Sep 2025 99.38 135.7 6.61 0.72 310 0.17 158.1 0.66 Pass
B25-0710 19 Aug 2025 99.16 133.3 6.95 0.69 304 0.10 155.1 0.33 Pass
B25-0724 15 Aug 2025 99.35 136.2 6.92 0.70 310 0.17 155.7 0.60 Pass